Concreting of columns

We realize the concreting of columns, which are essential for maintaining the stability of the building.

Precision pouring of the molds ensures that our columns are even, smooth and extremely strong. The concrete used for the poles must be of high strength, usually of grade C25/30 or higher, depending on the construction requirements. A well-chosen mix ensures the durability of the poles and
their resistance to loads.

How does the process of concreting the poles proceed ?

1.

Preparation of formwork

Special system formworks, such as Doka or Peri, are used for concreting the columns, which allow vertical, rectangular or circular columns to be formed. These formworks must be adapted to the dimensions and shape of the column.

2.

Preparation of column reinforcement

Column reinforcement is usually made of vertical steel bars connected by transverse stirrups, which form a grid to reinforce the entire structure.

3.

Concrete preparation

Concrete used for the columns must be of high strength, usually grade C25/30 or higher, depending on the structural requirements. It is delivered to the construction site using concrete mixers or pumps that allow the mixture to be poured directly into the column formwork.

4.

Pouring concrete

Concrete is poured into the column formwork in layers to ensure even distribution and prevent excessive pressure on the formwork. It is important to pour the concrete evenly and continuously monitor the level of concrete in the formwork to achieve a uniform surface and proper finish.

5.

Concrete compaction

The process of compaction by vibration helps remove air bubbles and ensures that the reinforcement is evenly wrapped in concrete, which increases the strength of the column. However, it is important not to over-compact the concrete, as this can lead to delamination of the mix and weakening of the structure.

6.

Formwork of poles

Depending on weather conditions and the grade of concrete, formwork can be removed after just a few days, when the concrete is hard enough to hold its form. In the case of architectural columns, where the aesthetics of the finish matter, the removal of formwork must be done with extreme care.

Why chooseOptimum Bau?

We look forward to working with you! Contact us to learn more about our products and services.

By choosing OPTIMUM BAU, you can count on our support at every stage of your project. Together we can build something special!

30 years of experience

Our extensive experience is a guarantee of high quality products and services. We know the needs of the market, and our solutions are tailored to various construction projects.

Top quality

We use only the best raw materials, so our products have exceptional strength and durability, ensuring safety and reliability in any project.

Wide range of products

We offer a comprehensive range of prefabricated construction products. Whether you are planning to build a house, an industrial facility or infrastructure, you will find everything you need in our offer.

Customer satisfaction

Our priority is complete customer satisfaction. We offer professional advice, timely delivery and support at every stage of your project. We are here to help you achieve your construction goals.

Frequently asked questions

If you do not find the answer to your question here, please feel free to contact our customer service department directly.

What are the benefits of professional formwork installation?

Professional installation of formwork ensures precise execution of concrete structures. Thanks to the professional approach of Optimum Bau’s installation team, the formwork is perfectly matched, which translates into durability and stability of the entire structure. This also minimizes the risk of errors that can lead to costly repairs.

What formwork systems does Optimum Bau use?

Optimum Bau uses the renowned PERI and DOKA formwork systems, which are known for their high quality, flexibility and durability. These systems allow fast and safe installation of formwork, which speeds up the construction process and ensures optimal results.

What is the difference between PERI and DOKA formwork?

Both formwork systems are high-end, but differ somewhat in design and purpose. PERI is more versatile and flexible in the context of complex projects, while DOKA is characterized by simplicity and speed of installation. The choice of system depends on the specific requirements of the project, and our specialists will help you choose the best solution.

What does the concrete floor restoration and polishing service consist of?

Floor restoration and polishing involves refreshing deteriorated concrete surfaces and giving them a new, aesthetically pleasing appearance. Polishing makes floors smooth, shiny and more resistant to wear and tear. This service is ideal for industrial, commercial and domestic surfaces.

What are the advantages of polished concrete floors?

Polished concrete floors are extremely durable, scratch-resistant and easy to clean. Their aesthetic appearance makes them perfect for modern interiors. In addition, thanks to polishing, concrete gains anti-slip properties and better resistance to moisture.

What types of structures does Optimum Bau perform in concreting stairs, terraces, columns, walls and floors?

Optimum Bau specializes in complex concreting of structural elements such as stairs, terraces, columns, walls and floors. Our experience and precision ensure high quality workmanship, regardless of the complexity of the project.

Is foundation concreting part of the services offered by Optimum Bau?

Yes, foundation concreting is a key service in our offer. Our team specializes in the implementation of solid and durable foundations, which are the basis for stable buildings. We use modern technologies and high-quality materials to ensure the durability and safety of foundations.

What are the steps in concreting the foundation?

The process of concreting foundations consists of several key steps: site preparation, placement of reinforcement, installation of formwork, pouring of concrete, and protection and care of the foundation after it is poured. Optimum Bau takes care of each of these steps, ensuring precision and high quality workmanship.

What is the reinforcement of beams, stringers, columns, walls and floors?

Reinforcement is the placement of steel bars in the structure, which reinforce the concrete, increasing its resistance to loads and stresses. Reinforcement of beams, stringers, columns and walls is a key element, ensuring the durability and safety of the entire structure.

Can you make the reinforcement according to our structural design?

Yes, we can make reinforcement according to your structural design, adapting to all requirements and technical specifications.

Does Optimum Bau offer technical advice?

Yes, at Optimum Bau we provide technical advice, from the selection of solutions to support during implementation.

Contact us

Whether you need more information about our services, want to discuss the details of cooperation, or simply share your vision, our team of experts is at your service.

Office hours: 7:00 – 15:00

Email address:
Address:

Gostchorze 54, 66-600 Krosno Odrzańskie

Formal data:

Optimum Bau Ltd.

NIP: 9261585866

REGON: 970208525

Send us a message

Prefabrykaty betonowe

Odkryj naszą gamę prefabrykatów betonowych, zaprojektowanych z myślą o trwałości i estetyce Twojego projektu. Od fundamentów po solidne elementy konstrukcyjne.

Nasze usługi

Specjalizujemy się w tworzeniu trwałych i estetycznych posadzek oraz ścian betonowych, dbając o najwyższy standard jakości w każdym aspekcie naszej pracy.

Domy Prefabrykowane

Precast concrete products

Discover our range of precast concrete products, designed for the durability and aesthetics of your project. From foundations to solid structural elements.

Our services

We specialize in creating durable and aesthetically pleasing concrete floors and walls, ensuring the highest standard of quality in every aspect of our work.